Complex works
Deep sewer, big stormwater, shoring boxes and large manholes. This is the work we go after.
What we take on
We run 38 t and 30 t excavators and crews who do deep and heavy drainage every week.
- Deep sewer and stormwater: benched trenches, trench shields and shoring boxes
- Big pipe: stormwater to 1650 mm, twin and triple barrel lines, box culverts
- Large manholes: poured in place with steel forms, up to 2100 mm
- Rock: dug with our machines
- Live connections: sewer and water tie-ins done inside the shutdown
- Away jobs: Yeppoon, Mackay and Kilcoy, with our plant floated in
On the job

Park Ridge: 1300 manhole
Steel form and reo cage set over the pipe, ready to pour.

Bayside, Redland Bay: three-barrel stormwater
Three lines laid side by side on a gravel bed.

Raceview: large steel manhole form
Steel form lowered onto the base for a poured manhole.

Manhole built inside a shoring box
Looking down the box: struts in, ladder in, manhole forms set at the bottom.

Taigum: twin stormwater outlet
Twin large-diameter line running out to the basin, both excavators working behind.

Riverbend, Mackay: trench shield
Our excavator walking the trench shield down the road to the next section of deep sewer.
Riverbend from the air

Benched excavation from above
Both excavators on the one dig.

Laying pipe at depth
Large stormwater pipe going in at the bottom of the benches.

The whole site
Both excavators, the service truck, pipe stockpiles and open trenches.
Hard ground, built right
Hammering rock in the trench
Our excavator with the rock breaker on, breaking the trench down to grade.

Sewer manhole base
Channels formed in the base and starter bars in, ready for the walls.
We lift our own pipe
The excavators dig and lift, so there is no crane to book and no waiting between digging and laying.