The Pines Stages 5–7 & 21 Trunk

Stormwater

Terra-Firma Civil is delivering the stormwater works at The Pines Stages 5–7 & 21 Trunk, Yeppoon. Our second project in Yeppoon, with the 38 t and 30 t excavators on site.

Scope of works

  • 1,221 m of stormwater to date
  • 12 manholes, pits and structures to date
  • Blackmax and concrete pipe, 375 to 1050 mm
  • Internal stages and trunk main

Complexity: Manholes up to 1500 mm diameter with benched bases and pipe up to 1050 mm on the trunk main.

Category
Stormwater
Location
Yeppoon
Commenced
Oct 2026
Completed
In progress

Hedley Park Stage 12

Sewer

Terra-Firma Civil is delivering the sewer works at Hedley Park Stage 12, Kilcoy. Our second stage at Hedley Park, following Stage 11 earlier in the year.

Scope of works

  • 678 m of sewer
  • 9 manholes, pits and structures
  • DN160 PE sewer with precast manholes and maintenance shafts

Complexity: Rock ripped along the sewer alignment and a live connection to the existing network.

Category
Sewer
Location
Kilcoy
Commenced
Oct 2026
Completed
In progress

Park Ridge

SewerStormwater

Terra-Firma Civil delivered the sewer and stormwater works at Park Ridge. The package covered the gravity sewer and stormwater for the development, run with our 38 t and 30 t excavators over roughly eleven weeks of recorded site days.

Scope of works

  • 3.5 km of gravity sewer across Stages 8 to 12
  • 49 sewer manholes and 49 maintenance shafts
  • 1.4 km of stormwater, 375 to 1050 mm
  • 24 stormwater structures, including custom steel manholes
  • Handed over with zero defects

Complexity: Seven custom steel-reinforced stormwater manholes from 1050 to 2100 mm diameter, standard manholes up to 1800 mm, PE-lined sewer manholes and sewer deeper than 3 m, all coordinated across five stages of a live subdivision.

Category
Sewer / Stormwater
Location
Park Ridge
Commenced
Jul 2026
Completed
Oct 2026

Bayside Stages 1–3

SewerStormwater

Terra-Firma Civil delivered the sewer and stormwater works at Bayside Stages 1–3, Redland Bay.

Scope of works

  • 653 m of sewer
  • 672 m of stormwater
  • 53 manholes, pits and structures
  • Stormwater 375 to 1200 mm with precast access chambers

Complexity: Precast access chambers up to 1500 × 1500 mm set more than 3 m deep, and stormwater up to 1200 mm diameter laid alongside sewer in the same corridors.

Category
Sewer / Stormwater
Location
Redland Bay
Commenced
Apr 2026
Completed
Jul 2026

188–190 Eggersdorf Road

SewerStormwater

Terra-Firma Civil delivered the sewer and stormwater works at 188–190 Eggersdorf Road, Ormeau.

Scope of works

  • 700 m of sewer
  • 629 m of stormwater
  • 67 manholes, pits and structures
  • Triple 900 mm culvert under the road

Complexity: A triple 900 mm culvert under the road and 19 concrete sewer manholes.

Category
Sewer / Stormwater
Location
Ormeau
Commenced
Mar 2026
Completed
Jun 2026

Gardner Road

SewerStormwaterWater

Terra-Firma Civil delivered the sewer, stormwater and water works at Gardner Road, Rochedale.

Scope of works

  • 196 m of sewer
  • 450 m of stormwater
  • 256 m of water main
  • 27 manholes, pits and structures
  • DN180 PE water main
Category
Sewer / Stormwater / Water
Location
Rochedale
Commenced
Mar 2026
Completed
Apr 2026

Pioneer, Raceview

SewerStormwaterWater

Terra-Firma Civil delivered the sewer, stormwater and water works at Pioneer, Raceview. A hydraulic services package delivered over several months.

Scope of works

  • 378 m of sewer
  • 526 m of stormwater
  • 368 m of water main
  • 37 manholes, pits and structures
  • Includes box culvert sections and a live sewer connection

Complexity: Live sewer connection works, box culvert sections and three services threaded through a constrained site.

Category
Sewer / Stormwater / Water
Location
Raceview
Commenced
Jan 2026
Completed
May 2026

Hedley Park Stage 11

SewerStormwaterWater

Terra-Firma Civil delivered the sewer, stormwater and water works at Hedley Park Stage 11, Kilcoy.

Scope of works

  • 501 m of sewer
  • 872 m of stormwater
  • 582 m of water main
  • 45 manholes, pits and structures
  • Internal stormwater plus the Hedley Drive line
Category
Sewer / Stormwater / Water
Location
Kilcoy
Commenced
Feb 2026
Completed
Mar 2026

Riverbend

SewerStormwaterWater

Terra-Firma Civil delivered the sewer, stormwater and water works at Riverbend, Mackay region. A regional project, with our excavators floated north and the crew based on site through to the new year.

Scope of works

  • 1,689 m of sewer
  • 1,144 m of stormwater
  • 1,276 m of water main
  • 81 manholes, pits and structures
  • Stormwater up to 1500 mm, including twin 1200 mm runs
  • DN200 irrigation main

Complexity: Stormwater up to 1500 mm diameter, twin 1200 mm runs, and manholes up to 1800 mm diameter with elongated bases to take the large pipes. A regional project, so plant was floated in and the crew lived away for the duration.

Category
Sewer / Stormwater / Water
Location
Mackay region
Commenced
Oct 2025
Completed
Jan 2026

Taigum

SewerStormwaterWater

Terra-Firma Civil delivered the sewer, stormwater and water works at Taigum. Twin lines of large-diameter concrete stormwater pipe, bedded, laid and backfilled by our crew.

Scope of works

  • 582 m of sewer
  • 1,160 m of stormwater
  • 687 m of water main
  • 63 manholes, pits and structures
  • Stormwater includes roofwater lines and pits

Complexity: A 1500 mm manhole with a 900 mm extension and internal weir, PE-lined sewer manholes, and sewer laid 3 to 4.5 m deep.

Category
Sewer / Stormwater / Water
Location
Taigum
Commenced
Aug 2025
Completed
Oct 2025

Yeppoon

SewerStormwaterWater

Terra-Firma Civil delivered the sewer, stormwater and water works at Yeppoon.

Scope of works

  • 2,391 m of sewer
  • 2,035 m of stormwater
  • 2,298 m of water main
  • 119 manholes, pits and structures
  • Stages 11 and 13

Complexity: Three services across two stages: 61 gully pits, manholes up to 1350 mm, and sewer deeper than 3 m, delivered as a regional project away from base.

Category
Sewer / Stormwater / Water
Location
Yeppoon
Commenced
May 2025
Completed
Nov 2025

Ormeau Ridge

SewerStormwaterWaterEarthworks

Terra-Firma Civil delivered the sewer, stormwater, water and earthworks at Ormeau Ridge.

Scope of works

  • 314 m of sewer
  • 530 m of stormwater
  • 235 m of water main
  • 17 manholes, pits and structures
  • Dual 1650 mm and triple 1200 mm stormwater runs
  • Deep sewer in rock

Complexity: A 2100 mm manhole with a 1000 mm extension built over an existing 1650 mm stormwater line, dual 1650 mm pipes laid 3.5 to 4.5 m deep, and sewer trenched through rock that had to be ripped.

Category
Sewer / Stormwater / Water / Earthworks
Location
Ormeau
Commenced
Mar 2025
Completed
Nov 2025

174 Bleasby Road

SewerStormwaterWater

Terra-Firma Civil delivered the sewer, stormwater and water works at 174 Bleasby Road, Eight Mile Plains.

Scope of works

  • 103 m of sewer
  • 418 m of stormwater
  • 54 m of water main
  • 17 manholes, pits and structures
  • Twin 450 mm stormwater and a box culvert section

Complexity: 1500 mm manholes on a tight infill site, with live works on the existing sewer and water main and reinstatement of the public road.

Category
Sewer / Stormwater / Water
Location
Eight Mile Plains
Commenced
May 2025
Completed
Aug 2025

Koplick Road

SewerStormwaterWater

Terra-Firma Civil delivered the sewer, stormwater and water works at Koplick Road, Park Ridge. Water main installation along Koplick Road, including the road crossing and reinstatement.

Scope of works

  • 1,049 m of sewer
  • 294 m of stormwater
  • 925 m of water main
  • 40 manholes, pits and structures
  • DICL and PVC water main
Category
Sewer / Stormwater / Water
Location
Park Ridge
Commenced
Apr 2025
Completed
May 2025

Ripley Sewer

Sewer

Terra-Firma Civil delivered the sewer works at Ripley. Deep sewer work with our 38 t excavator on site most days.

Scope of works

  • 595 m of sewer
  • 14 manholes, pits and structures
  • DN160 PE sewer to 4.5 m deep

Complexity: Sewer laid to more than 4.5 m deep with 1050 mm manholes.

Category
Sewer
Location
Ripley
Commenced
Feb 2025
Completed
Apr 2025

200 Barrams Road

SewerStormwaterWater

Terra-Firma Civil delivered the sewer, stormwater and water main for a new estate at White Rock, across three stages.

Scope of works

  • About 1.5 km of DN160 PE gravity sewer, up to 3.5 m deep
  • About 1.5 km of stormwater, 225 to 750 mm
  • Water main, 180 and 125 mm
  • 27 sewer manholes and 90 stormwater pits, inlets and headwalls
Category
Sewer / Stormwater / Water
Location
White Rock
Commenced
Oct 2024
Completed
Feb 2025

School Road

SewerStormwater

Terra-Firma Civil delivered sewer and stormwater for a subdivision, including roofwater and house connections.

Scope of works

  • Gravity sewer and house connections
  • Stormwater from 225 mm PVC to 700 mm concrete pipe
  • Sewer and stormwater pits and headwalls
  • Excavation in rock
Category
Sewer / Stormwater
Commenced
Sep 2024
Completed
Dec 2024

Andrews Road

Sewer

Terra-Firma Civil delivered the gravity sewer and house connections, then roofwater connections.

Scope of works

  • 150 mm gravity sewer
  • 16 house connections
  • Roofwater connections
Category
Sewer
Commenced
Aug 2024
Completed
Dec 2024

Greenbank

Sewer

Terra-Firma Civil delivered the gravity sewer reticulation.

Scope of works

  • About 770 m of gravity sewer
  • 19 manholes
  • 37 house connections
Category
Sewer
Location
Greenbank
Commenced
Aug 2024
Completed
Sep 2024

Willawong

Stormwater

Terra-Firma Civil delivered the stormwater works at Willawong. Large stormwater structures built in sequence around weather and design changes.

Scope of works

  • About 1.7 km of HDPE stormwater, 100 to 1500 mm
  • 93 m of 1500 × 1500 precast box culvert
  • 35 manholes from 1050 to 2100 mm, including double-lift 2100 mm manholes
  • 22 pits and a headwall

Complexity: 2100 mm manholes with 900 mm extensions built in double lifts, and a 1500 × 1500 mm precast culvert.

Category
Stormwater
Location
Willawong
Commenced
Jul 2024
Completed
Dec 2024

Yamanto

Stormwater

Terra-Firma Civil delivered stormwater drainage in 375 and 450 mm concrete pipe.

Scope of works

  • About 230 m of 375 and 450 mm RCP
  • Field inlets and pits
Category
Stormwater
Location
Yamanto
Commenced
Jul 2024
Completed
Jul 2024

Park Ridge (2024)

Stormwater

Terra-Firma Civil delivered a deep trunk stormwater section.

Scope of works

  • 1200, 750 and 375 mm stormwater
  • Three 1050 mm manholes and a headwall

Complexity: Large-diameter 1200 mm pipe in a deep trench.

Category
Stormwater
Location
Park Ridge
Commenced
Jun 2024
Completed
Jun 2024

Jimboomba

Stormwater

Terra-Firma Civil delivered stormwater and roofwater drainage for a subdivision.

Scope of works

  • 225 mm PVC stormwater and roofwater
  • 6 pits
Category
Stormwater
Location
Jimboomba
Commenced
May 2024
Completed
May 2024
Where we work

South East Queensland and regional Queensland

Locations shown at suburb or town level: Park Ridge, Ormeau, Redland Bay, Raceview, Ripley, Kilcoy, Yeppoon, Mackay region, Taigum, Eight Mile Plains, Rochedale, Willawong, White Rock, Greenbank, Yamanto, Jimboomba.

Pricing a project?

Send through the drawings and your program. We'll price it and tell you what gear we'd put on it.